This was an ambitious project of McMillan & Lockwood to undergo in collaboration with EPRO.
The project began in March 2019, with McMillan & Lockwood working with design consultants to blend the existing red and black perfectly to meet Council-approved requirements while maintaining aesthetic consistency.
The main challenge presented by this project was the bricklaying side of things.
Take a look through the photo gallery to see the changeable, complex, and irregular shape of the black bricks. To lay them required the utmost patience, skill, and care – something only the EPRO team could step up to.